Tariff Component Granularity

NERSA has separated Eskom’s generation, transmission, and distribution charges for the first time under MYPD6. ODS-E provides granular unbundled tariff component fields to carry this structure at the interval level.

Context

The SAETA “Policy to Power” report describes the need for cost-reflective, unbundled tariffs that distinguish fixed from variable costs and make non-bypassable charges transparent (Action 2). The Electricity Pricing Policy revision aims to align regulated pricing with a competitive market. Tariffs rose 937% between 2007 and 2024.

Timeseries Fields

Field Type Description
generation_charge_component number >= 0 Unbundled generation charge for this interval
transmission_charge_component number >= 0 Transmission use-of-system charge
distribution_charge_component number >= 0 Distribution network charge
ancillary_service_charge_component number >= 0 Ancillary services levy (frequency control, reserves)
non_bypassable_charge_component number >= 0 Non-bypassable charges (cross-subsidies, FBE contributions)
environmental_levy_component number >= 0 Environmental or carbon levy

Relationship to Existing Fields

The existing energy_charge_component and network_charge_component from the market context extensions represent a two-part split. These new fields provide a finer decomposition:

Implementers may use either the two-part split or the granular decomposition. If both are present, the granular fields take precedence.

Example

{
  "timestamp": "2026-02-17T08:00:00+02:00",
  "kWh": 250.0,
  "error_type": "normal",
  "direction": "consumption",
  "tariff_schedule_id": "za-eskom:national:TOU-2026:v3",
  "tariff_period": "peak",
  "tariff_currency": "ZAR",
  "generation_charge_component": 425.00,
  "transmission_charge_component": 87.50,
  "distribution_charge_component": 112.75,
  "ancillary_service_charge_component": 18.25,
  "non_bypassable_charge_component": 32.50,
  "environmental_levy_component": 9.75
}